Commercial Gas – Testing & Purging

Commercial Gas Testing, Purging & CP16 Certification

Our Services

What does it involve?

Atlas Gas provides commercial gas testing, purging and CP16 certification services for businesses, contractors and property owners. Whether you’re introducing gas into a new installation, reinstating supply following works, or carrying out decommissioning purges as part of building alterations, removals or demolition projects, our experienced engineers will manage the process safely, professionally and in full compliance with current standards.

Testing and purging form a critical part of ensuring a gas installation is safe before it is brought into use or taken permanently out of service. Where new pipework has been installed or existing pipework has been modified, strength testing is carried out first to confirm the integrity of the installation, followed by tightness testing prior to introducing gas.

Jobs Completed
0 +
Customers
0 +

Pipework Testing and Purging

Once testing has been successfully completed, controlled purging operations are undertaken to safely introduce or remove gas from the pipework as required. Purging is carried out in a safe manner, away from sources of ignition and in suitable locations, using approved methods to ensure gas is safely dispersed.

All testing and purging works are completed in accordance with IGE/UP/1 (IGUP1) guidance and current industry best practice, with safety as the priority at every stage. As part of this process, Atlas Gas issues CP16 Gas Safety Certificates where required, providing confirmation that the installation has been tested, purged and commissioned in line with current regulations.

How we can help

We understand that many clients are unfamiliar with gas procedures, particularly on live or operational sites or during building removals. That’s why we take a calm, organised approach — explaining what’s required in clear terms, coordinating where necessary, and working efficiently to minimise disruption.

What We Can Help With

Commercial pipework support

Commercial gas testing and purging for planned work, alterations and recommissioning

Atlas Gas helps contractors, facilities teams and property owners organise gas pipework testing, purging and CP16 documentation where it is part of the agreed scope. The service is set up for commercial premises where clear planning, safe sequencing and practical communication matter.

Need to plan a test, purge or recommission? Share the site details, pipework context and required timescale, and Atlas Gas can advise on the next sensible step.

Talk to Atlas Gas
Commercial gas pipework documentation and planning Commercial gas meter and pipework installation Gas pipework installation detail Gas pipework installation on site
What the visit can cover

Testing, purging and certification support without overcomplicating the project

Pipework testing

Support for commercial gas pipework testing before use, after changes or when a site needs a clearer picture of the pipework condition.

  • Tightness and strength-test conversations where relevant
  • Clear explanation of the work before attendance
  • Practical advice for access and isolation planning

Controlled purging

Gas pipework purging is planned around the site conditions, the reason for the work and how the system needs to be brought back into service.

  • Purging for new, altered or decommissioned pipework
  • Commercial premises, plant rooms and external runs
  • Coordination with contractors or site teams

CP16 where scoped

CP16 certification can be included when the job requires it and the inspection scope is agreed in advance.

  • Useful for records, handover and compliance files
  • Explained in plain language for non-technical teams
  • Provided alongside the relevant test or purge work
Project-ready approach

How Atlas Gas keeps testing and purging work manageable

1

Scope the pipework

Understand the site, pipework route, access needs and reason for testing or purging.

2

Plan the attendance

Agree sensible timing, communication and preparation so the visit fits the wider project.

3

Complete the work

Carry out the agreed testing, purging or recommissioning support in a controlled way.

4

Provide next steps

Explain the outcome clearly and advise on documentation, remedial work or further support if needed.

Need Advice?

If you’re unsure whether testing, purging or decommissioning is required for your project, get in touch. We’re happy to talk it through and advise on the safest and most appropriate approach.